Casey from SWISCO responded:
July 26, 2010
The 15-025 is first inserted into the channel balance
Next, drilled for a rivet, we use a drill press but you can use a hand drill with 75-502 drill bit, Then the 62-005 rivet is inserted and stamped with the 75-075 tool. The 19-008 is installed in the same way. For more information about this installation process, take a look at the following guide: Balance Accessory Replacement Guide Also, if we do not have balance series pre-made with the top and shoe you want, you can custom order a complete balance. A custom ordered balance will come with the top and shoe pre-attached. |